Центральний проектний інститут

Державне підприємство міністерства оборони україни

Modrox
  • Home
  • About Us
  • Services
  • Projects
  • News
  • Jobs
  • Information on preventing corruption
  • Contacts
+380 (44) 275-51-66+380 (44) 275-51-44

Kyiv-Zhuliany Airport Air Field Complex Reconstruction Plan

Two stages were accomplished as follows:

  • Provision of land survey and inspection of the air field (SE MODU «Central design institute»);
  • Elaboration of the Air Field Complex Development Concept (joint elaboration of «Airport Consulting Vienna» and SE MODU «Central design institute»)

Designers:

«Airport Consulting Vienna» (Austria)
SE MODU «Central design institute»

Customer:

«Master-Avia» LLC

   Prev Post
Next Post